If you're receiving a BuildOps Sync Failed error on a receipt "Sync Failed - Error in PO detail. Invalid phase cost type combination for job"


Check that the phase codes have synced over from Spectrum by checking the Spectrum tab. If they're populated and there's a code matching the error, reach out to BuildOps support at [email protected]