If you're missing cost cods or phase codes on a BuildOps job, editing and saving the job will cause a resync.

Background sync to Spectrum runs ever 30 minutes.


Find the job in the job list.

Select the job

Click Edit in the top right

Click Save


You can see the phase codes in the Spectrum tab near the bottom.